Sourced at a fair price, so you keep more margin.
We buy electrical and mechanical materials across markets for each order, and pass the difference to you.
Send us your bill of materials and get every line priced, landed to site, with a delivery date you can plan around.
Quotation Q 1048
Bill of materials, grouped
Landed cost
Quoted on Oct 14, 2026
Valid until Oct 28, 2026
On this sample, the same package was quoted elsewhere at $22,140.00. The spread between the two numbers is $2,768.00 you keep.
Where the price actually comes from.
Stocking distributors carry inventory so you can get material fast, and you pay for that warehouse on every order. We source on demand for major projects, with no inventory to carry, fewer steps and lower overhead. Both have a place. On planned, large-volume work, ours costs less.
How we earn
We only make money when you save. Our business is beating the price you already have from a major distributor, so our margin comes out of that gap. If we cannot come in under your number, there is nothing for us to sell.
Send us a bill of materials →What we need to quote
- Bill of materials or takeoff
- Spec standards and approvals
- Delivery date and site
- Approved vendor list, if there is one
- 01
Markets
We buy the order, not the shelf
Each order goes out to the mills, manufacturers and markets that can hold your spec, and the order is placed with whoever holds it at the strongest price. Nothing here comes off a single shelf at a single list price.
- 02
Staging
We split the buy across your build
Long lead items are placed first so the date holds. Material you need in three months is bought on your schedule, not on ours and not on the market's.
- 03
Open book
We show you every line
Material, freight and duties are priced on their own lines with a date the number holds to, so you can see exactly what you are paying and hold us to it.
- 04
Provenance
We buy nothing we cannot trace
Mill test reports, heat numbers and country of origin come with the order wherever the spec calls for them. Sourcing wide does not mean sourcing loose.
- 05
Your margin
We only win if you save
Our price has to beat the one you already have, because our margin is the spread inside it. Everything below that gap stays in your job as margin you keep.
Watch every order as it moves.
Once your order is placed we follow it through the mill and onto the truck, and each status change reaches you close to real time. You can schedule crews and lifts around a date that is current today, not one from last week.
- →Every order shows its current step and next date
- →Status updates pushed as they happen, not on request
- →A date that slips arrives with the reason and the new one
Order 2207 · Sch 40 pipe
Ordered
Oct 02
Confirmed by mill
Oct 06
Shipped
Oct 21
On site
Oct 29
Latest updates
- Oct 21Shipped from the mill, on site Oct 29
- Oct 17Production complete, heat numbers received
- Oct 06Mill confirmed the order and the date
Send us the bill of materials.
01
Send
Email the bill of materials to info@partnerwithargus.com. A takeoff, a spec sheet or a scanned list all work.
BOMTakeoffPDF · Excel02
Quote
Every line priced and landed to site within two business days, one landed price for the whole order.
Line itemsFreightDutiesLanded total03
Deliver
We place the order, follow it with the mill, and send mill test reports and heat numbers with the delivery.
TrackingMTRsSite delivery
Materials we source.
These are the lines we carry most often. Where an operator holds an approved vendor list we buy inside it, and where a spec allows an equal manufacturer we name it and the reason before you accept.
Electrical
- Conduit, EMT and fittingsRigid · CSI
- Cable tray, ladder and troughNEMA VE 1
- Enclosures and boxesNEMA 1 · 4 · 4X
Mechanical
- Carbon steel pipeA106 B · Sch 40 to 80
- Flanges and fittingsASME B16.5
- Pipe supports and hangersRigid · adjustable
Not on this list
We source well past the two columns above. If it is on your bill of materials we will source it, and tell you plainly when we cannot.
Ask us about your list →- Structural steel
- Fasteners
- Instrumentation
- Hose and fittings
- Consumables
- Specialty alloys
Questions contractors ask us first.
- Quote turnaround
- Two business days
- Delivery
- Serving Western Canada
- Our price
- One landed number
- Payment terms
- Set per account
Your distributor's number reflects what they paid some time ago and what they need to earn on the item, and it carries the cost of their warehouse and everyone between them and the mill. We quote from your spec, buy across markets, and run with fewer middle parties and lower overhead, so our number comes in tighter and the detail behind it is on the quote.
It depends on the material and the week, so we will not promise you a percentage. What we promise is a sourced price rather than a list price, and a quote that shows every line so you can check the number yourself.
We earn on the gap. Our margin is the spread between what we can source the order for and the landed price on your quote, so if we do not come in under the number you already have, there is no deal for either of us. Fewer middle parties and lower overhead means less that has to be built into it.
Every quote carries a valid until date. Where the market allows, we can hold pricing longer or stage purchases to protect your number.
We tell you before you find out. Updates reach you as each order moves, and if a date moves you get the new date, the reason, and what we are doing about it, in time to reschedule the work around it.
